Project name: Beach Green Dunes III.
Location: New York, USA.
Installed equipment: BlauAIR BL01 CFP1200 S31 with heat recovery.
We’re proud to support the new Beach Green Dunes III development with the installation of a BlauAir BL01 CFP1200 S31 heat recovery ventilation unit. This all-electric, Passive House–focused project features 146 apartments and is built to meet the highest standards of sustainability and resiliency.
Why the CFP1200? Because it delivers high-performance balanced ventilation in a compact, ceiling-mounted design – ideal for multi-family buildings aiming to reduce energy consumption while improving indoor comfort.
With the CFP series, buildings benefit from:
- High-efficiency counter-flow heat recovery
- Quiet EC fan operation
- Integrated plug-and-play controls
- MERV13 filtration
- BACnet / Modbus connectivity for smart building integration
This makes the CFP1200 a reliable solution for Passive House projects, energy-efficient retrofits, and new multi-family construction.
A special thank-you to Matthew M. and the TOWER ENTERPRISES team for the professional installation work.